Specifications

ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Lead Set Length
  • 48 in (1.22m)
Shielded
  • Shielded
Number of Leads
  • 16
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • IEC
Product details
Product details
Use with Philips Healthcare Equipment
  • 860315, 860310
Use with Non-Philips Healthcare Equipment
  • No
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • Yes
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Product details
Product details
Use with Philips Healthcare Equipment
  • 860315, 860310
Use with Non-Philips Healthcare Equipment
  • No
See all specifications
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Lead Set Length
  • 48 in (1.22m)
Shielded
  • Shielded
Number of Leads
  • 16
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • IEC
Product details
Product details
Use with Philips Healthcare Equipment
  • 860315, 860310
Use with Non-Philips Healthcare Equipment
  • No
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • Yes
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
  • Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.

You are about to visit a Philips global content page

Continue

You are about to visit a Philips global content page

Continue

Our site can best be viewed with the latest version of Microsoft Edge, Google Chrome or Firefox.

Pristupate Philipsovim hrvatskim internet stranicama zdravstvene skrbi
Please select the checkbox

Ove internet stranice namijenjene su isključivo osoblju koje se koristi medicinskim proizvodima u obavljanju svoje djelatnosti, uključujući zdravstvene radnike, osoblje koje postupa u ime zdravstvenih institucija i/ili osoblje koje se profesionalno bavi trgovinom medicinskim proizvodima.

Spadate li u kategoriju osoba koje udovoljavaju gornjim kriterijima?

Da Ne